About

Capital Projects

Completed Construction Projects

View all

Capital Projects

Battery Park City Authority – Completed Construction Projects

NYC Police Memorial – Expansion
Location: Riverwalk at Liberty Street & South End Avenue
Completed: July 2022

Community Center Restoration Project
Location: Bounded by Warren St. (north), Murray St. (south) & West St. / 9A (east)
Completed : September 2021

Ball Fields Resiliency Project
Location: Bounded by Warren St. (north), Murray St. (south) & West St. / 9A (east)
Completed: April 2022

Pile Remediation – Phase 7
Location: Multiple locations along BPC Esplanade: adjacent to Wagner Park;
adjacent to Rector Place; adjacent to Rockefeller Park
Completed: March 2022

Irish Hunger Memorial Restoration

Construction began in 2016 on the Irish Hunger Memorial Restoration and Waterproofing Project, which was designed to repair damage to the Memorial and arrest and remediate water infiltration into the Memorial structure.

Completed: Fall 2017

South Cove Jetty Decking Replacement & Bracing Repair

The South Cove (the “Cove”) is a nationally significant waterfront art installation located in the southern neighborhood of Battery Park City at the Waterfront Esplanade between First Place and Third Place that includes a curved, wooden jetty that extends into the water. 

Completed: 2019

West Thames Pedestrian Bridge

The West Thames Pedestrian Bridge links the south neighborhood of Battery Park City to the east side of West Street, and provide residents of and  visitors to Battery Park City, a safer means  of crossing the West Side Highway. 

Completed: 2019

North Esplanade Restoration Project

Construction began in 2016 on the North Esplanade Restoration Project to restore certain portions of the Esplanade platform, granite slabs, pile caps, timber piles and rip rap.

 Completed: 2017